Cisco DDR2200 Series Manual de usuario Pagina 8

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 41
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 7
Method and Procedure
Field Operations Support MP-2009-08-002/ Issue 10 / Date: 11-01-10
Process Owner: Centralized Operations - Field Operations Support
Information contained in this document is proprietary
Unauthorized disclosure outside CenturyLink Corporation is prohibited
8
7.0 Central Office Responsibilities
Central Office Technicians and/or Frame Attendants will be responsible for wiring two ADSL2+ ports so
the bonded service can be utilized, and performing testing (using your HST-3000) to ensure good
physical line statistics at each wired port. This process consists of wiring both ports (will be assigned
consecutively) in the same manner as single DSL ports are wired today. Bonded ADSL2+ orders will
include two C001, D001, F001, and F002 fields indicating the ports and office pairs that are assigned to a
particular customer order. See example below.
Vista de pagina 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 40 41

Comentarios a estos manuales

Sin comentarios