Cisco 7300-6T3 Manual de usuario Pagina 23

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 54
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 22
CHAPTER
2-1
Clear Channel 6-Port T3 (DS3) Line Card Installation and Configuration
OL-3449-02
2
Preparing for Installation
This chapter describes the general equipment, safety, and site preparation requirements for installing the
6T3 line card. This chapter contains the following sections:
Required Tools and Equipment, page 2-1
Software and Hardware Requirements, page 2-2
75-Ohm In-Line Coaxial Attenuator (Optional), page 2-2
Safety Guidelines, page 2-2
Required Tools and Equipment
You need the following tools and parts to install a line card. If you need additional equipment, contact
a service representative for ordering information.
6T3 line card
T3 SMB interface cables
Number 2 Phillips screwdriver
Your own electrostatic discharge (ESD)-prevention equipment or the disposable grounding wrist
strap included with all upgrade kits, field-replaceable units (FRUs), and spares
Antistatic mat
Antistatic container
Attenuator kit (optional)
Vista de pagina 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 53 54

Comentarios a estos manuales

Sin comentarios