Cisco 2948G-GE-TX - Catalyst Gigabit Ethernet Switch Guía de instalación Pagina 16

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 18
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 15
Chapter 4 Configuring the Gigabit Ethernet Ports
Connecting To an SFP Module
4-16
Catalyst 2984G, 2948G-GE-TX, and 2980G Switch Hardware Installation Guide
78-6286-04
Step 4 Observe the port LED.
The LED turns green when the switch and the target device have an
established link.
The LED turns amber while the STP discovers the network topology and
searches for loops. This process takes about 30 seconds, and then the port
LED turns green.
If the LED is off, the target device might not be turned on, there might be a
cable problem, or there might be problem with the adapter installed in the
target device. See Chapter 5, “Troubleshooting the Installation, for solutions
to cabling problems.
Vista de pagina 15
1 2 ... 11 12 13 14 15 16 17 18

Comentarios a estos manuales

Sin comentarios