Cisco 3750-48TS - Catalyst Switch - Stackable Guía de instalación Pagina 70

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 198
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 69
Chapter 3 Switch Installation
Preparing for Installation
3-10
Catalyst 3750 Switch Hardware Installation Guide
78-15136-02
Figure 3-1 Connecting to the Console Port
Powering On the Switch and Running POST
If your configuration has an RPS, connect the switch and the RPS to the same AC
power source. See the Power Connectors section on page 2-16, and refer to the
Cisco RPS documentation for more information.
Note Always put the RPS in standby mode when you are connecting devices to it and
in active mode during normal operation.
To power on the switch, follow these steps:
Step 1 Make sure that you have started the terminal emulation software program (such as
ProComm, HyperTerminal, tip, or minicom) from your management station. See the
Connecting a PC or Terminal to the Console Port section on page 3-8 for
information on connecting to the switch console port.
Step 2 Connect one end of the AC power cord to the AC power connector on the switch.
1 Console port
CONSOLE
STACK 1
STACK 2
86685
1
Vista de pagina 69
1 2 ... 65 66 67 68 69 70 71 72 73 74 75 ... 197 198

Comentarios a estos manuales

Sin comentarios