Cisco 3750-48TS - Catalyst Switch - Stackable Guía de instalación Pagina 94

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 198
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 93
Chapter 3 Switch Installation
Installing the Switch
3-34
Catalyst 3750 Switch Hardware Installation Guide
78-15136-02
Figure 3-32 Attaching the RPS Connector Cover on the Catalyst 3750G-12S, 3750-24TS, 3750G-24T,
and the 3750-48TS Switches
Mounting the Switch on a Wall
For the best support of the switch and cables, make sure the switch is attached
securely to wall studs or to a firmly attached plywood mounting backboard.
Mount the switch with the front panel facing up, as shown in Figure 3-33.
Warning
To comply with safety regulations, mount the switches on a wall with the front
panel facing up.
1 Phillips pan-head screws 3 RPS connector
2 RPS connector cover
RATING
100-200V ~
1.6A-0>9A, 50-60 HZ
DC INPUTS FOR REMOTE
POWER SUPPLY
SPECIFIED IN MANUAL
+12v @8.5a
CONSOLE
STACK 1
STACK 2
21 3
86572
Vista de pagina 93
1 2 ... 89 90 91 92 93 94 95 96 97 98 99 ... 197 198

Comentarios a estos manuales

Sin comentarios