Cisco 4948 - Catalyst Switch Guía de instalación Pagina 61

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 162
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 60
3-19
Catalyst 4948E and Catalyst 4948E-F Switch Installation Guide
OL-21561-02
Chapter 3 Installing the Switch
Attaching the Interface Cables
Figure 3-12 Verifying the SFP Transceiver Installation
Note For an optical SFP transceiver, before removing the dust plugs and making any optical connections,
observe the following guidelines:
Always keep the protective dust plugs on the unplugged fiber-optic cable connectors and the
transceiver optical bores until you are ready to make a connection.
Always inspect and clean the LC connector end-faces just before making any connections. See the
Tip on this page for a pointer to a fiber-optic inspection and cleaning white paper.
Always grasp the LC connector housing to plug or unplug a fiber-optic cable.
Step 9 Remove the dust plugs from the network interface cable LC connectors. Save the dust plugs for future
use.
Step 10 Inspect and clean the LC connector’s fiber-optic end-faces.
Tip For complete information on inspecting and cleaning fiber-optic connections, see the white-paper
document at this URL:
http://www.cisco.com/en/US/tech/tk482/tk876/technologies_white_paper09186a0080254eba.shtml
Step 11 Remove the dust plugs from the SFP transceiver optical bores.
Step 12 Immediately attach the network interface cable LC connector to the SFP transceiver.
192383
Vista de pagina 60
1 2 ... 56 57 58 59 60 61 62 63 64 65 66 ... 161 162

Comentarios a estos manuales

Sin comentarios