Cisco MDS 9200 Series Guía de instalación Pagina 105

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 164
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 104
3-9
Cisco MDS 9200 Series Hardware Installation Guide
OL-16188-01
Chapter 3 Connecting the Cisco MDS 9200 Series
Connecting to a Fibre Channel Port
Note Use only Cisco SFP transceivers on the Cisco MDS 9200 Series. Each Cisco SFP transceiver is encoded
with model information that enables the switch to verify that the SFP transceiver meets the requirements
for the switch. For instructions specific to the transceiver type, see the “SFP Transceiver Specifications”
section on page B-9.
The Cisco MDS 9000 Family supports SFP transceivers with the following two types of latching devices:
Mylar tab latch (Figure 3-5)
Bale-clasp latch (Figure 3-6)
Figure 3-5 SFP Transceiver with Mylar Tab Latch
Figure 3-6 SFP Transceiver with Bale-Clasp Latch
Installing an SFP Transceiver
To install an SFP transceiver, follow these steps:
Step 1 Attach an ESD-preventive wrist strap and follow its instructions for use.
Step 2 Remove the dust cover from the port cage.
Step 3 Remove the dust cover from the port end of the transceiver.
Step 4 Insert the transceiver into the port:
If the transceiver has a Mylar tab, orient the transceiver with the tab on the bottom, and then gently
insert the transceiver into the port until it clicks into place.
If the transceiver has a bale clasp, orient the transceiver with the clasp on the bottom, close the clasp
by pushing it up over the transceiver, and then gently insert the transceiver into the port until it clicks
into place.
Caution If the transceiver does not install easily, ensure that it is correctly oriented and the tab or clasp
are in the correct position before continuing.
63065
63067
Vista de pagina 104
1 2 ... 100 101 102 103 104 105 106 107 108 109 110 ... 163 164

Comentarios a estos manuales

Sin comentarios