Cisco XR 12410 Manual de usuario Pagina 216

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 238
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 215
Chapter 5 Maintaining the Router
Removing and Installing a Chassis
5-44
Cisco XR 12410 and Cisco XR 12810 Router Installation Guide
OL-17441-01
Step 13 Remove the chassis from the rack.
Warning
An empty chassis weighs approximately 125 pounds (56.7 kg). You need two
people to remove the chassis from the equipment rack safely.
a. Using the side handles to support the weight of the chassis, remove the screws
that attach the chassis rack mount flanges to the rack posts.
Warning
There is nothing to support the chassis in the rack when you remove the screws
if the optional rack-mount support brackets are not installed.
b. Carefully lift the chassis out of the rack and set it aside.
Installing a Replacement Chassis in the Equipment Rack
Use the following procedure to install the replacement chassis and components in
the equipment rack.
Step 1 Install the new chassis in the rack (see Rack-Mounting the Router Chassis,
page 3-15).
Step 2 Install the power supplies (see Removing and Replacing an AC PEM, page 5-14,
or Removing and Replacing a DC PEM, page 5-23).
Step 3 Install the blower module (see Removing and Replacing the Blower Module,
page 5-9).
Step 4 Install cards in the line card and RP card cage (see Removing and Replacing Cards
from the Line Card and RP Card Cage, page 5-38).
Step 5 Install cards in the switch fabric and alarm card cage (see Removing and
Replacing Cards from the Switch Fabric and Alarm Card Cage, page 5-40).
Step 6 Install the chassis air filter (see Cleaning or Replacing the Chassis Air Filter,
page 5-5).
Step 7 Connect all line card and interface cables (see Connecting Line Card Network
Interface Cables, page 3-34).
Vista de pagina 215
1 2 ... 211 212 213 214 215 216 217 218 219 220 221 ... 237 238

Comentarios a estos manuales

Sin comentarios