Cisco InfiniBand 4x Guía de usuario Pagina 84

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 174
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 83
70 Implementing Cisco InfiniBand on IBM BladeCenter
9. Click Configure to designate a name for the initiator (Figure 4-54). This name will be used
later when mapping to a storage target.
Figure 4-54 Assign name to SRP Initiator
10.After you designate a name, click Submit. The initiator moves from Discovered Hosts to
Configured Initiators (Figure 4-55).
Figure 4-55 Configures SRP Initiator
11.Each Fibre Channel port on the bridge module has a port WWN. On the storage device,
the bridge port WWN needs to be mapped to the logical drives. A Fibre Channel
connection has to be established between the bridge port and the storage device for the
storage device to see the bridge port WWN.
Figure 4-56 Bridge Port Link Information
Figure 4-57 Bridge Port WWN in IBM System Storage™ DS4300
Vista de pagina 83
1 2 ... 79 80 81 82 83 84 85 86 87 88 89 ... 173 174

Comentarios a estos manuales

Sin comentarios