Cisco WS-X6708-10G-3CXL= - 10 Gigabit Ethernet Module Manual de usuario Pagina 45

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 62
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 44
White Paper
© 2010 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public Inf ormation. Page 45 of 62
Figure 32.
Standby Virtual Switch Chassis Failure
The failure of the standby virtual switch chassis is handled and detected in the same manner as a failure of the hot-
standby supervisor engine (Figure 33).
Figure 33.
Complete VSL Failure (Dual Active)
The active supervisor engine discovers the failure of the VSL either through a link-down event or through the failure
of the periodic VSLP messages sent across the member links to check the VSL link status. From the perspective of
the active virtual switch chassis, the standby virtual switch is lost. The standby virtual switch chassis also views the
active virtual switch chassis as failed and transitions to active virtual switch state through an SSO switchover. This
scenario is known as a dual-active scenario (Figure 34).
Vista de pagina 44
1 2 ... 40 41 42 43 44 45 46 47 48 49 50 ... 61 62

Comentarios a estos manuales

Sin comentarios