
Chapter 2 Installing and Starting the Switch
Preparing for Installation
2-6
Catalyst 3550 Multilayer Switch Hardware Installation Guide
78-11358-03
Site Requirements
When determining where to place the switch, be sure to observe these
requirements:
• For 10/100 and 10/100/1000 ports, cable lengths from the switch to connected
devices are up to 100 meters.
• For 100BASE-FX ports, the cable length from a switch to an attached device
does not exceed 6562 feet (2 kilometers) for full-duplex connections.
• For 1000BASE-X GBIC ports, cable lengths from the switch to the connected
devices are up to 100 kilometers. For specific cable lengths, refer to the GBIC
documentation.
• For 1000BASE-T GBIC ports, cable lengths from the switch to the connected
devices are up to 100 meters. For specific cable lengths, refer to the GBIC
documentation.
• For GigaStack GBIC ports, cable lengths from the switch to the connected
devices are up to 1 meter. For specific cable lengths, refer to the GigaStack
GBIC documentation.
• Operating environment is within the ranges listed in Appendix A, “Technical
Specifications.”
• Clearance to front and rear panels is such that
–
Front-panel indicators can be easily read.
–
Access to ports is sufficient for unrestricted cabling.
–
Rear-panel power connector is within reach of an AC power receptacle.
• Airflow around the switch and through the vents is unrestricted.
• Temperature around the unit does not exceed 113°F (45°C).
Note If the switch is installed in a closed or multirack assembly, the temperature around
it might be greater than normal room temperature.
• Cabling is away from sources of electrical noise, such as radios, power lines,
and fluorescent lighting fixtures.
Comentarios a estos manuales