Cisco Catalyst 7500 Series Especificaciones Pagina 99

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 303
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 98
2-21
Cisco 7500 Series Installation and Configuration Guide
OL-5008-03 B0
Chapter 2 Preparing for Installation
Equipment Rack-Mounting Guidelines
Figure 2-12 Chassis Footprint and Outer Dimensions (Cisco 7513, Cisco 7513-MX, and Cisco 7576)
Caution To prevent chassis overheating, never install the router in an enclosed rack or room that is not properly
ventilated or air-conditioned.
When planning your Cisco 7513, Cisco 7513-MX, or Cisco 7576 rack installation, consider the
following guidelines:
Install the router in an open rack whenever possible. If installation in an enclosed rack is
unavoidable, ensure that the rack has adequate ventilation.
If you plan to use an equipment shelf, ensure that the shelf is constructed to support the weight and
dimensions of the chassis. Figure 2-12 shows the chassis footprint, which you will need if you are
designing a customized shelf. We recommend that you use the rack-mount kit designed for the Cisco
7513, Cisco 7513-MX, and Cisco 7576.
Allow sufficient clearance around the rack for maintenance. If the rack is mobile, you can push it
back near a wall or cabinet for normal operation and pull it out when necessary for maintenance
(installing or moving interface processors, connecting cables, or replacing or upgrading
components). Otherwise, allow 19 inches (48.3 cm) of clearance to remove the blower module,
power supplies, and processor modules.
Plastic front
panel end
18.93
in.
19 in. required
for blower removal
12.73 in.
3.94 in.
17.50
in.
14.57
in.
18.75
in.
21.23
in.
1.47
in.
1.75 in. 4 places
H3178
Vista de pagina 98
1 2 ... 94 95 96 97 98 99 100 101 102 103 104 ... 302 303

Comentarios a estos manuales

Sin comentarios