
2-4
Cisco Catalyst 4000 Access Gateway Module Installation and Configuration Note
OL-3008-01
Chapter 2 Installing the Access Gateway Module
Installing the AGM
Caution To prevent ESD damage, handle the AGM by the carrier edges only. Moreover, you should use a
wrist strap or other grounding device to prevent ESD damage.
To install the AGM, perform these steps:
Step 1 Choose a slot for the new AGM.
Note The AGM can be inserted into slots 2 or 3 in the Catalyst 4003 switch and slots 2 through 6 in the
Catalyst 4006 switch. In the Catalyst 4003 and Catalyst 4006 switches, slot 1 is reserved for the
supervisor engine.
Ensure that you have enough clearance to accommodate any interface equipment that you will connect
directly to the AGM ports. If possible, place AGMs between empty slots that contain only switching
module filler plates.
Step 2 Loosen the captive installation screws securing the switching module filler plate (or the existing
switching module) to the desired slot.
Step 3 Remove the switching module filler plate (or the existing switching module). Save the switching
module filler plate for future use.
Note If you are removing an existing switching module, refer to the “Removing Catalyst 4000
Switching Modules (optional)” section on page 2-2.
Step 4 To install the new AGM, hold the switching module front panel with one hand, and place your other
hand under the carrier to support the module, as shown in Figure 2-2. Do not touch the printed circuit
boards or connector pins.
Step 5 Align the edges of the AGM carrier with the slot guides on the sides of the switch chassis, as shown in
Figure 2-2.
Comentarios a estos manuales